The project involves the construction of a water supply network using HDPE pipelines, with pressure ratings ranging from 12.5 to 25 bar, in various diameters and with a total length of 2,955.00 meters. The project also includes the construction of the necessary isolation, inspection, branch, drain and air-release valve chambers to ensure the proper operation of the network. The physical scope of the project also includes all necessary electromechanical equipment for the external water supply networks of the settlements, in order to ensure their most effective monitoring and control, as well as the installation of new equipment in existing water reservoirs wherever required.