The project concerns the reinforcement of the external water supply network of the Livadero community and includes the following:
Installation of equipment at the existing L/4 borehole, including a borehole pump, control and automation systems, etc., in the Prophet Elias area on the northern outskirts of Livadero, with the aim of integrating the borehole into the Livadero water supply network.
Construction of a new rising main (1/K) extending from the borehole to the new water reservoir serving the settlement.
Construction of the new Livadero water reservoir at the Prophet Elias site, with a capacity of 250 m³.
Construction of the new feeder pipeline (1Σ) from the new reservoir to the existing distribution network.
Construction and installation of all necessary control and operational devices for the proper functioning of the new water supply system, including control valves, level-control and flow-measuring devices, air-release valves and network drain arrangements.
The total length of the new external water supply network is 765 m, comprising 377 m of rising main 1/K and 388 m of the new feeder pipeline 1Σ, connecting the new reservoir to the existing distribution network.